Seawall height and code guidance
Find the wall measurement you need and check local height rules before raising or replacing your seawall.
- Top of the capMeasured from a fixed survey reference.
- WaterlineRises and falls with tides and weather.
- Survey reference (datum)A named reference, such as NAVD88.
Use the survey reference printed beside the elevation.
How high should your seawall be?
Your city or county may set a lowest or highest allowed elevation for the top of the wall. The rules can change with the property’s location and the work planned. Drainage, flooding and neighboring properties also affect the design.
For local height rules, use the top-of-cap elevation on your survey. This is the top of the wall measured from a fixed survey reference. It is different from the wall’s bottom-to-top height or the water level.
Find these two items on your survey.
Find the elevation for the top of the seawall cap and the survey reference used with it. The example below shows what to look for.
Seawall cap elevation
- Top of seawall cap
- 6.00 ft
- Survey reference (datum)
- NAVD88
This example shows 6.00 ft NAVD88. Use the number and reference on your own survey.
Match the value and the reference.
- The elevation: use the number for the top of the wall cap, not a building floor, water depth or the wall’s full height.
- The reference: copy the name beside the elevation, such as NAVD88 or NGVD29. You can compare elevations only when they use the same reference.
- Cannot find both? Choose “No / not sure” in the checker. Ask a surveyor to help find them; measuring from the water will give a different result.
What does NAVD88 mean?
NAVD88 is a fixed survey reference used to measure elevations, like a shared zero point. Another survey may use NGVD29 or a tide-based reference. To compare two elevations, they must use the same reference. A surveyor can help if the references differ. Read NOAA’s explanation of survey references.
Look for the seawall cap elevation on your survey or final construction plans. A flood certificate may show only the building’s elevation. If the wall measurement is missing, ask a surveyor; you do not need to measure beside the water.
Repair, replacement and permits
Before raising or replacing the wall, ask the permitting office which rules apply to the work. An engineer can check whether the existing wall, supports and drainage can handle the change. A higher wall can also change where rainwater flows.
Use the permit guide to find the local, Florida DEP and U.S. Army Corps of Engineers contacts. Describe your location and planned work and ask which permits you need. Florida DEP’s application instructions explain the information needed for shoreline projects.
Common questions
How do I plan a change in wall height?
Start with your survey, the wall’s condition and the change you want to make. An engineer can check the supports, drainage and effects on nearby properties. Tell us about your plans and we’ll help you prepare the next step.
Is maximum height the height I must build?
A maximum is the highest allowed elevation, not a target you must build to. Ask your permitting office whether there is also a minimum for your property.
What if I do not know the elevation?
You can start with the property address and what you want to change. A surveyor can identify the top-of-cap elevation and its reference on your survey.
Can an existing seawall be raised?
An engineer needs to check the wall, supports and drainage before recommending a height change. The right approach may involve modifying the wall or replacing parts of it.
Does meeting a number mean the wall is safe?
Height is only one part of the wall’s condition. The supports, drainage and signs of damage also matter. Use the warning-sign check to prepare for an assessment.
How can I get help with the height?
Tell us the property’s city or county and what you want to change. Discuss the next steps, including whether you need a survey or seawall assessment. Confirm any service details and price before going ahead.
Jacksonville has not adopted a private seawall height standard
The city’s Resilient Jacksonville strategy (October 2023) commits to setting height standards for public and privately owned bulkheads, drawing on practice elsewhere and an upcoming compound flood risk assessment. The city’s 2024 update lists the public-bulkhead action as ongoing but not the private one, and we found no adopted minimum height for private seawalls in the city’s published rules. The same strategy says the city will limit new bulkhead permits on private property along tributaries and favor green or hybrid shorelines where feasible.
Until a standard is adopted, your cap height is a design decision. Confirm with the city before you design, and ask your engineer whether the wall can be raised later without rebuilding it.
Resilient Jacksonville, Action 16 'Invest strategically in hardened shorelines' · Office of Resilience (with 2024 and 2025 Annual Updates) · Resilient Jacksonville, Action 8
Reference numbers to discuss with your engineer
- Normal high water is about 1.96 ft NAVD88 at Mayport, 0.65 ft downtown and 0.39 ft at the Buckman Bridge.
- Irma reached 4.89 ft above normal high water at the Main Street Bridge and 5.2 ft at the Buckman Bridge.
- Jacksonville requires new buildings in flood zones to be two feet above base flood elevation, in NAVD88.
- St. Augustine targets +7.1 ft NAVD for its bayfront wall.
None of these is a seawall rule for your property. They help you and your engineer choose a height with known margins.
Mayport (Bar Pilots Dock) 8720218 datums · Southbank Riverwalk 8720226 datums · I-295 Buckman Bridge 8720357 datums · Main Street Bridge historic crests · NWPS historic crests (BKBF1, DMSF1, MYPF1, SRPF1, GCEF1, FRDF1) · Ordinance 2023-615-E (Chapter 652 Floodplain Management amendments) · Floodplain Definitions · Avenida Menendez Seawall Project Fact Sheet
Give the designer a survey that resolves the transitions
- Identify the survey date, vertical datum (NAVD88) and benchmark used for the cap elevations.
- Measure enough points to show low spots, returns and connections to neighbors’ walls; one average cap number can hide a low transition.
- Show yard grades, drains, dock connections and the proposed scope on the same drawing.
Higher walls can trap rain behind them. The city’s resilience strategy notes bulkheads often need tide valves and pumps for that reason, so plan drainage with the height.
Frequently Asked Questions: Datums · Resilient Jacksonville, Action 16
Show sourcesHide sources
- Resilient Jacksonville, Action 16 'Invest strategically in hardened shorelines'Source reviewed 2026-10-24
- Office of Resilience (with 2024 and 2025 Annual Updates)Source reviewed 2026-10-24
- Resilient Jacksonville, Action 8Source reviewed 2026-10-24
- Mayport (Bar Pilots Dock) 8720218 datumsSource reviewed 2026-10-24
- Southbank Riverwalk 8720226 datumsSource reviewed 2026-10-24
- I-295 Buckman Bridge 8720357 datumsSource reviewed 2026-10-24
- Main Street Bridge historic crestsSource reviewed 2026-10-24
- NWPS historic crests (BKBF1, DMSF1, MYPF1, SRPF1, GCEF1, FRDF1)Source reviewed 2026-10-24
- Ordinance 2023-615-E (Chapter 652 Floodplain Management amendments)Source reviewed 2026-10-24
- Floodplain DefinitionsSource reviewed 2026-10-24
- Avenida Menendez Seawall Project Fact SheetSource reviewed 2026-10-24
- Frequently Asked Questions: DatumsSource reviewed 2026-10-24
- Resilient Jacksonville, Action 16Source reviewed 2026-10-24
Ask about local requirements
Identify the property and the question to resolve. Keep any available survey with your planning notes.